Telangana High Court

WP/33716/2025 of G. Vijaya Vardhan Vs The Union of India on 9 January 2026

Cites 0, Cited by 0

ERABADHIGH COURT FOR THE STATE OF TELANGANA AT (Special Original Jurisdiction) FRIDAY, THE NINTH DAY OF JANUARY TWO THOUSAND AND TWENTY.SIX PRESENT THE HONOURABLE SRI JUSTICE NAGESH BHEEMAPAKA WRIT PETITION : 33716 OF 2025 Between: G. Vijaya Vardhan, S/o. G. Sundara Rao, aged about 60 years, Tea

[ 3300 I

ERABAD

HIGH COURT FOR THE STATE OF TELANGANA AT

(Special Original Jurisdiction)

FRIDAY, THE NINTH DAY OF JANUARY

TWO THOUSAND AND TWENTY.SIX

PRESENT

THE HONOURABLE SRI JUSTICE NAGESH BHEEMAPAKA

WRIT PETITION

: 33716 OF 2025

Between:

G. Vijaya Vardhan, S/o. G. Sundara Rao, aged about 60 years, Tea Stall Contractor, Stall No. 17, Plat Form No. 4-5, Kachiguda Railway Station, Hyderabad. R/o. 18- 3431112, Mallikarjuna Nagar, West Malkajgiri, Secunderabad - 500047

.,.PETITIONER

AND

'1 . The Union of lndia, rep., by its Secretary, Ministry of Railways, Railway Bhavan, Sansadh Marg, New Delhi.

2. The South-Central Railway (SCR), rep., by its General Manager, Rail Nilayam, Secunderabad.

3. The Principal Chief Commercial Manager, South Central Railway, Rail Nilayam, Secunderabad

4. The Senior Divisional Commercial Manager, Hyderabad Division, South Central Railway, Secunderabad

...RESPONDENTS

Petition under Article 226 of the Constitution of lndia praying that in the circumstances stated in the affidavit filed therewith, the High Court may be pleased to issue an appropriate writ, order or direction more particularly one ln the nature of Writ of Certiorari, to call for the records relating to and in connection with the lmpugned Proceedings No. Y/C.79/Catg/KCG-GMU-TSIPF-41512O25 dt'

26.09.2025, issued by the 4th Respondent, in terminating the Tea Stall contract of the Petitioner at Plat Form No. 4/5 Middle (KCG-0171 and set aside the same by declaring them as highly illegal, unjust, arbitrary, discriminatory and violative of Articles 14 and 16 of the Constitution of lndia and consequently, direct the Respondents to renew/extend the Petitioner's contract period in respect of Tea Stall No. 17, Plat Form No. 4-5 tViddle at Kachiguda Railway Station, as per Clause 3.2 ol [Vaster License Agreement and as per the policy of the IVinistry of Railways, as implemented by the South Central Railway, as was done and considered in respect of similarly placed license holders and to pass any such order or ord,:rs as this Honorable Court may deem fit and proper in the circumstances; of the case.

:

lA NO: 3 OF 2025

Petition underSection 151 CPC praying that in the circumstances stated in the affidavit filed in support of the petition, the High Court may be pleased to grant stay of all further proceedings in respect of Tender No. YC-79-CATG-KCG- 017-TS, dt: 13.11.2025, and Bid Notice No. Y/C/79/CaIg/GIVU/A1,A,B&C1112O25, dt: 10.11.2025 to the extent of Tea Stall (GMU-017) situated in between Platform no. 415, Kachiguda Railway Station, Hyderabad Division, by suspending the above proceedings and to pass any such order or orders.

lA NO: 2 OF 2025

Petition rlnder Section 151 CPC praying that in the circumstances stated in the affidavit fik:d in support of the petition, the High Court may be pleased to direct the Respondents to renew / extend the Petitioner's contract period in respect of Tea Stall No. 17, Plat Form No. 4-5 Middle at Kachiguda Railway Station, as per Clause 3.2 of Master License Agreement and as per the policy of the tVlinistry of Railways, as implemented by the South Central Railway, as was done and consi,Jered in respect of similarly placed license holders, by suspending the operation of lmpugned Proceedings No. YlC.T9lCatglKCG-GIVIU-TS/PF- 41512025 dt: 26.09.2025, issued by the 4th Respondent.

IA NO: 1 OF 201!5

Petition under Section 151 CPC praying that in the circumstances stated in the affidavit fileC in support of the petition, the High Court may be pleased to permit the Petiti,:ner to file, this WP by dispensing with the filing of Original Copy of the lmpugned Proceedings No. Y1C.TS|CaIg|KCG-GMU-TS/PF-41512O25 dt:

26.O9.2025, issued by the 4th Respondent.

Counsel for the Petitioner : SRI POODATTU AMARENDER

co u nse I ror the Res ponde nt'

SXLIi".li:i tl:*"Tt?i ^r,,

The Court made the following: ORDER

L

€6

i1

NBK, J

IN THB HIGH COURT FOR THE STATE OF TELANGANA

AT HYDERABAD

THE HON'BLE SRI JUSTI

NAGE,SH BHEEMAPAKA

WRITPETITIO

No-33716 of 2O25

09th Januarv.2026

Between:

G. Vijaya Vardhan S/o G. Sundara Rao

... Petitioner

AND

1. -fhe Union of India, rep. by its Secretary, Ministry of F:ailways, ancl others Respondents

Citations and Judicial Treatment

No citing decisions in the index yet

Cited by

0

Decisions in the index citing it

Cites

0

Decisions referred to

In this index

0

Of the decisions it cites

Overruled / Questioned

0

No negative treatment found

Loading the citing and cited decisions…

ORDER:

.The pe titioner seeks quashing of the impugned proceedings dated 26.09.2025 by which the 4th Respondent-Senior Divisional Commercial Manager, tenninated his tea stall contract at Platform Nos. 4/5 (Middle), Kachiguda Re.ilway Station, and to direct renewal or extension of his licence in accordancr: with Clause 3.2 of the Master Licence Agreement dated 03.10.2016 and the Catering Policy-2010. 1.1 T'he facts of the case are that the 4th Respondent-Senior Divisional Crrmmercial Manager, issued a tender notification dated 30.11 .2015 inviting bids for various stalls, including Tea Stall No. 017/KCG/4-5/TS at Kachiguda Railway Station. The petitioner applied for multiple stalls and emerged as the successful bidder for the Kachiguda stall. By letter datecl 11.07.2016, the 4th Respondent awarded him the contract,

. NBK, J and pursuant to the agreement, he commenced operations with effect from 01.09.2016. Under the Railway Board's Catering Policy-2010, as incorporated in Article 3.2 of the Master Licence Agreement dated 03.10.2016, the initial licence tenure was five years, with a provision for renewal for further periods of three years each upon satisfactory performance. Accordingly, the petitioner's initial five-year term was to expire on 31.08.2021, and he asserts that he operated continuously from 01.09.20[6, cleared all dues, and ran the stall to the satisfaction of both authorities and the public. 1.2 Before completion of the initial term, the petitionen applied on 23.08.2021 for renewal of the licence for a further three years underArticle 3.2. Due to the Covid-19 pandemic, a dies-non extension was granted up to 16.04.2022. The petitioner maintains that, in normal course, the renewal ought to have carried the licence up to 16.04.2025. lnstead, the 4th Respondent granted a series of short-term extensions: from 01 .11.2022 to 31.01 .2023 by orders dated 19.10.2022; from 01.02.2023 to 30.04.2023 by orders dated 25.01,.2023; from 01.05.2023 to 31.07.2023 by orders dated 20.05.2023; from 01.11.2023 to 31.01.2024 by orders dated 01.11.2023; from 01.02.2024 to 30.04.2024 by orders dated 01.02.2024; from 01,.05.2024 to 31.07.2024 by orders dated 22.04.2024; and finally from 01.1 1 .2024 to 31.07 .2025 by orders dated 26.12.2024. 1.3 In the midst of this, the 4th Respondent issued a letter dated 10.03.2022 stating that the renewal process would be initiated subject to submission of documents and an affidavit in the prescribed format under Commercial Circular No. 22 of 201 7 on Rs. 100/- stamp paper. The petitioner states that the respondent demanded an affidavit that he would forego all other stalls and retain only one, citing the Railway Board's Circular No. 22 I

il wp_33715_2025 NBK, J of 20[7 datt:d 15.03.2017, which limited one person to one stall. Aggrieved, the petitione:r filed W.P. No. 18604 of 2022, wherein interim directions were granted on 13 .04.2022 directing the respondents to continue his stall at Platflorm Nos. 4/5, Kachiguda. He asserts that pursuant to these interirn directions and Railway policy, his licence was extended fiom time to time, culrrrinating in the extension up to 3l .07.2025 by orders dated 26.12.2024. 1.4 As the extended period approached expiry, the petitioner submitted ar, application dated 31.07.2025 to the 4th Respondent seeking further exter':sior1 in accordance with headquarters guidclines. He alleges that there was no response, and that on 01.08.2025 his tea stall was abruptly closed witho,rt notice and without consideration of his application. He then addressed a detailed representation dated 22.09.2025, invoking directions of the IJon'ble liuprerne Court, Railway Board guidelines, and South Central Railway clarifications, asserting that existing licensees of rninor static catering units were entitled to continue operations under status-quo orders until a further policy decision, and requesting reopening of the stall and also sought an explanation for closure of tea stall. According to the petitioner, this representation also elicited no response. 1.5 I\{eanwhile, W.P. No. 18604 of 2022 was listed on 25.08.2025 and dismisse<l on the basis of what the petitioner characterizes as an elroneous sub nission by the Standing Counsel for the Central Government that his licenc,: had expired on 16.04.2025 and that no cause survived. The petitioner contends that this was factually incorrect because his licence had been extended up to 3 1 .07 .2025 and his application dated 31.07 .2025 for extension was oending. He further explains that his earlier counsel could not effectively represent him due to shifting practice after bifurcation, and he has since initiated a review application which is pending.

NBK, J 1.6 Shortly thereafteq the 4th Respondent issued the impugned Proceedings dated 26.09.2025 tenninating his contract on the ground that the writ petition No.18604 of 2022 had been closed as infructuous. The petitioner alleges that this termination was passed without notice or opportunity of hearing, solely relying on the dismissal of the writ petition No. 18604 of 2022, and without considering his pending application dated 31.07.2025 or his representation dated 22.09.2025. He contends that the dismissal of the writ petition No. 18604 of 2022 cannot have bearing on termination because his contract had repeatedly been extended in line with Ministry of Railways instructions dated 13.05.2019, 21.05.2019, 27.08.201.9, 13.12.2021, 12.05.2022, 13.07.2023, and 18.04.2024, all of which directed maintenance of "status qlto" for rninor catering units based on judgments of the Hon'ble Supreme Court and the Delhi High Court. 1.7 The petitioner asserts that his licence was valid until 31.07.2025; that he submitted an application for renewal on the very last day i.e., on 31.07.2025; and that termination of his licence without considering his application violates Clause 3.2 of the Master Licence Agreement. The petitioner alleges that he has been discriminated, pointing out that partnership firms were granted three-year renewals while individuals like him were given only six-month status-quo extensions, and that similarly placed licensees received more favorable treatment. He specifically cites that P. Srinivas Rao at Bheemavaram Town received renewal up to 03.11 .2025 by orders dated 30.04.2025, and that G. Vijayvardhan at Tenali and Annavaram was granted a three-year extension from ?1.07.2025 to 20.07.2028 by orders dated 07.07.2025 of the DCM, South Central Railway, Vijayawada, while others in the Secunderabad division were extended up to I

.,) wp_33716_2025 NBK, J 2027. He contends that clespite headquarters advising issuance of status-quo orders for individual contracts, this division denied him the same benefit. 1.8 The petitioner also relies on the history of litigation challenging Commercia Circular No. 22 of 2017 before the Delhi High Court, interim status-quo orders therein, subsequent directions of the Hon'ble Supreme Court, and Railway Board communications, including eurails and letters dated 21.05.10[9, directing maintenance of status quo as on 31.03.2019 and even reopening ol' closed stalls. He alleges that the 4th Respondent rnisinterprett:d these judgments and policies and acted contrary to them. On these grouncs. and noting that he was not even served a signed copy of the impugned order dated 26.09.2025, the petitioner seeks a writ of certiorari to call for the 'ecords pertaining to the impugned Termination Proceedings dated 26.09.'.2025, and to set aside the same, and to issue a consequential direction to renew or extend his licence on the same footing as other similarly plar;ed license holders.

2. . A courter affidavit has been filed by the 4th respondent, on behalf of all the respondents. While admitting that the General Minor Unit (Tea Stall) bearing No. 017|KCG|4-5/TS at Kacheguda Railway Station on Platforms 4 and 5 was awarded to the petitioner, G. Vrjay Vardhan, for a period of five years from 0 L09.201 6 to 3 I .08.2021, under an agreement dated 03. 10.2016, it is contendt:d that due to the COVID-l9 pandemic, the contract was extended by 228 days, resulting in the effective completion of the original contractual tenure on 16.04.2022.It is contended that under Clause 20.2 of the Master Lir:ence Agreement, the parties are independent contractors and no vested or p:lrtnership-like rights accrue to the licensee. 2.1 Referring to .{rticle 3.2 of the Master Licence Agreement, which governs tenure and renewal, it is contended that licence has an initial wp_33715_2025 NBK, J term of five years with a provision for renewal for periods of three years, however, renewal is explicitly "not a matter of right." The clause requires the licensee to apply for renewal at least six months in advance of expiry, and submit a no-dues certificate, and also turnish documents afresh as per Chapter I of Section B of the Bid Document, and withdraw any court cases. According to the respondents, since the contract stood extended up to 16.04.2022, the petitioner ought to have applied for renewal by 16.10.2021 with all requisite documents, however, the petitioner did not do so. Consequently, the Railways addressed a letter dated 10.03.?022 to the petitioner, calling upon him to submit the prescribed docutnents, including an affidavit under Commercial Circular No. 22 of 2017 . This letter, marked as Annexure R-[[, was intended to afford the petitioner an opportunity to comply with policy before the contract expired. 2.2 [n response to the letter dated 1,0.03.2022 addressed by the Railways, the petitioner sent a letter dated I 1.03 .2022, which the respondents reproduce and rely upon heavily. They point out that instead of submitting the required documents or affidavit, the petitioner raised objections and hypothetical concems, stating that if he submitted the affidavit he would have to forgo his entire railway business in future, and the petitioner questioned how the clause was being implemented against him, and asserted that he had participated in an open tender on the understanding of a "5+3 years" tenure. The respondents argue that this reply neither expressed a clear willingness to renew on policy terms nor complied with the contractual prerequisites, thereby demonstrating that the petitioner was unwilling to accept renewal conditions. Nevertheless, the Railways issued a further letter dated 16.03.2022, granting him a final opportunity to submit the documents within l0 days, and the petitioner was warned that if

,,) wp_33716_2025 NBK, J he fails to :;ubmit the documents, the contract would stand terminated on I 6.04.2022 rvithout further notice. 2-3 It is contended that the petitioneq instead of submitting the documents, filed W.P. No. 18604 of 2022 on ll .04.2022, even before the expiry of tht: l0-da,v period nrentioned in the letter dated 16.03.2022. The respondents :ontend that this conduct shows that the petitioner attempted to put pressure rn the administration to secure extension without following the agreed proct:dure. They further allege that the petitioner was already operating rnrrltiple stalls in other divisions and had doubts about his eligibility un,ler the "one person-one unit" rule, which is why he avoided submitting th,: atlidavit. According to the respondents, this conduct amounts to lack of clean hands and bias, as the petitioner sought to continue multiple stalls in violation of fair competition norms. 2.4 T'he respondents placed strong reliance on commercial circular No.22 of 2017, issued pursuant to Railway policy and Supreme Court judgments, which overrides earlier catering policies. [t is contended that the Circular mandates that only those minor catering static unit licensees who declare otl affidavit that they do not hold more than one unit-such as one refreshment room, one catering stall, or one trolley-anywhere on Indian Railwa.rs, whether in their own name or benami, are eligibte for renewal. [f a licensee holds more than one unit, he must forgo all others except the one sought to be renewed. False declarations are treated as material breact, leading to termination and debarment. The respondents asseft that the retitioner admittedly held at least two other stalls, one at Annavaram and one at Tenali, which the petitioner himself disclosed in the writ proceeding:;. This, they argue, conclusively establishes his ineligibility for renewal unless he tumished the prescribed affidavit agreeing to forgo the i

NBK, J other units, which he refused to do. They further allege suppression of this material fact before the Court. 2.5 [n rebuttal to the petitioner's reliance on Article 3.2 and the petitioner's claims of an assured "5+3" or eight-year tenure, the respondents argue that the petitioner selectively quoted the agreernent while suppressing crucial portions. They explain that Clause 3.1 states that renewal is on mutually agreed terms, and Article 20.1 lays down an order of precedence in interpretation, placing Railway's latest policies above the agreement itself. Thus, Cornmercial Circular No. 22 of 2017 and subsequent Railway Board letters prevail. They also rely on the petitioner's own letter dated 11r,.03.2022, where he asserted that he had bid high believing the contract to be for eight years, to show that he misunderstood and misinterpreted the contract conditions. 2.6 With regard to the petitioner's allegation of discrimination, the respondents state that all similarly placed licensees under Catering Policy- 2010. in the division were granted extensions only after submitting the mandatory affrdavit and documents under Commercial Circular No. 22 of 2017 . They refer to tabular statements (Annexure R-VI and other annexures) listing such vendors to demonstrate uniform application of poticy. According to them, the petitioner is not similarly situated because he holds multiple stalls and has persistently refused to comply with the affidavit requirement. They also clariff that the extensions granted to the petitioner beyond the original term, including the three-year period from 01.08.2022 to31.07.2025, were given only out of deference to interim orders of the High Court in W.P. No. 18604 of 2022 and not because he satisfied renewal conditions. (

NBK, J 2.7 With respect to the closure of the earlier writ petition, the respondentt; state that W.P. No. 18604 of 2022 was dismissed as infructuous by order dated 25.08.2025, after the petitioner's extended period had effectively run its course. Following the dismissal of the writ petition No.18604 ol- 2022, thc railway administration sought legal opinion on whether the stall should be renewed or terminated. Upon noting that the petitioner hzrd still not submitted the rnandatory affidavit or documents and considering the legal advice, the administration decided to terminate the contract, wh ch \vas conlmunicated by letter dated 26.09.2025. It is therefore contended tltat this was a reasoned adrrrinistrative decision grounded in contract, policy. and law, and not an arbitrary action. 2.8 Thc respondents rebut the petitioner's reliance on various Railway Board circulars and status-quo directions by citing Railway Board letter No.20l6lTG-lII1600/01 dated 13.12.2021, which clarified that even licenses granled prior to Catering Policy-2017 are governed by Commercial Circular No. .]2 of 201 7 and the Board's letter dated 27 .08.2019. According to the- respon,Jents, this clarifrcation squarely applies to the petitioner and negates his claim that the circular is inapplicable to him. Further, the respondents contend that the petitioner suppressed material facts, attempting to monopolize catering units by continuing multiple stalls indefinitely. They allege that the petitioner is operating stalls at Tenali and Annavaram and has even obtained interim orders in W.P. No. 13582 of 2022 before the High Court ofAndh.'a Pradesh to continue operations at Tenali without submitting the mandated lffidavit. They contend that such conduct defeats the social objectives of Railway catering policies, which are designed to prevent monopolies &fl,1 ensure wider livelihood opportunities.

wp_33716_2O25 NBK, J 2.9 It is finally contended that since the petitioner's contract stood Iawfully terminated, the Railway administration has issued a fresh tender notification for the subject stall on 17.11.2025, with bids scheduled to be opened on 05.12.2025, emphasizing that public interest and fair competition require that the stall be reallotted through due process. On these grounds, the respondents contend that the writ petition lacks merit and is liable to be dismissed.

3. Heard Mr. P. Amarendeq learned counsel for the petitioner; and Ms. N.V.R. Rajyalakshmi, learned counsel appearing for Mr. N. Bhujanga Rao, learned Deputy Solicitor General tbr the respondents. Perused the record.

4. Learned counsel for the petitioner contends that the petitioner was lawfully granted a tea stall licence under the Catering Policy,20l0 for an initial period of five years commencing from 0l .09.2016, with a contractual assurance of renewal for a further period of three years on satisfactory performance, as embodied in Clause 3.2 of the Master Licence Agreement dated 03.10.2016. It is urged that the petitioner duly performed all contractual obligations, cleared all dues, and was continuously permitted to operate the stall, including through successive extensions granted by the respondents up to 31.07.2025, thereby creating a legitimate expectation of renewal. Learned counsel submits that the abrupt closure of the stall on 01.08.2025 and the subsequent termination order dated 26.A9.2025 were passed without notice, without considering the petitioner's application dated 31.07.2025 and representation dated 22.09.2025, and in violation of principles of natural justice. It is further argued that the insistence on an aflidavit under Commercial Circular No. 22 of 2017 is arbitrary and inapplicable to the petitioneq who secured the contract through an open ++- t t tender, and that similarly placed vendors were granted renewals or long-term

wp_33715_2025 NBK, J extensions, rendering the impugned action discriminatory and violative of Articles 14 and l6 of the Constitution of India.

5. Leanred counsel for the respondents would subrnit that the licence granted to the petitioner expired by etllux of time and that renewal under Clause 3.2 of the Mastcr Liccnce Agreernent is not a matter of right but is conditional upon strict compliance with contractual stipulations and prevailing Railway policies. [t is contended that the petitioner failed to apply for renewal six months in advance, failed to submit mandatory documents, and deliberately retused lo furnish the affidavit required under Commercial Circular No 22 of 2017, despite repeated notices dated 10.03.2022 and 16.03.2022. Learned counsel ernphasizes that the petitioner was holding multiple catering units at Annavaram and Tenali, making him ineligible for renewal unle'ss he agreed to forgo the other units, and that all similarly situated licensees who cornplied with the policy were granted renewal. It is further subnLitted that the extensions granted to the petitioner up to 31.07.2025 uere only in deference to interim orders of this Court and not in recoghition of any vested right. Learned counsel therefore contends that there is no illegality in the irnpugned termination order dated 26.09.2025, and therefore the writ petition is liable to be dismissed.

6. Having considered the respective contentions and perused the record, it may be nott:d that the dispute arises out of the termination of a catering licence granted to the petitioner for a General Minor Unit (Tea Stall) at Kachiguda Railway Station. On fbcts, there is no serious controversy that the petitioner was granted a licence for a fixed period of five years from 01.09.2016 to 31.08.2021 under the Master Licence Agreement dated 03.10.2016, and that owing to the Covid- I 9 pandemic, a dies-non extension L2

NBK, J of 228 days was granted, resulting in completion of the original contractual tenure on 16.04.2022. 6.1 [t is to be noted that the petitioner's assertion that he had an automatic and vested right to renerval for a fur-ther three years and that the respondent authorities acted arbitrarily in not granting such renewal, is misplaced assertion, as it is not in accordance with the terms of Article 3.2 of the Master Licence Agreement itself. While the petitioner emphasizes the availability of renewal, he conspicuously omits the equally explicit stipulations that renewal is "not a matter of right," that an application must be made at least six months prior to expiry, and that renewal is conditional upon submission of prescribed documents, including an affidavit, no-dues certificate, and compliance with prevailing Railway policies. 6.2 The record further reveals that the petitioner did not apply fior renewal six months prior to 16.04.2022, that is, by 16.10.2021, as contractually mandated. This factual lapse has not been disputed by the petitioner with any documentary proof. Instead, when the respondent authorities, by letter dated 10.03.2022, specifically called upon him to submit the requisite documents and affidavit in terms of Commercial Circular No. 22 of 2017, the petitioner responded on 11.03.2022 not by complying with the demand, but by questioning the applicability of the policy, asserting an assumed "5+3 years" entitlement, and expressly declining to submit the affidavit on the ground that it would require him to forgo other stalls. This correspondence, relied upon by the respondents and not denied by the petitioneq clearly demonstrates that the petitioner was unwilling to comply with the goveming policy conditions for renewal. The respondents issued a further letter dated 16.03.2022 grarttingan additional 10 days' time and clearly warning that failure to comply would result in \

NBK, J termination on 16.04.2022. The petitioner has not rebutted the issuance or contents ol'this notice; instead, he filed W.P. No. 18604 of 2022 even before the expiry,rf the said period. 6.3 It is to be noted that Cornrnercial Circular No. 22 of 2017 assumes clitical significance, and the said circulaq issued pursuant to Railway policy and in the backdrop of judgments of the Hon'ble Supreme Couft, exp:essly overrides earlier catering policies and mandates that renewal of minor catering units is permissible only upon an affidavit declaring that the licensee holds not more than one unit, and that if rnultiple units are ht:ld, all others must be tbryone except the one sought to be renewed. TtLe petitioner has neither disputed the existence nor the contents of this circular; his case rests solely on the contention that it should not apply to him. Thir; contention is directly contradicted by Article 20.1 of the Master Licrlnce Agreement, which accords primacy, in the order of precedence, to 6'Railway's latest policies as applicable from time. to time." The respondents have also placed reliance on Railway Board clarification dated L3.t2.2021, which reiterates that even licences granted prior to the Catering Policy-2017 are governed by Commercial Circular No. 22 of 2017. The petitioner has lailed to place any cogent material to counter this clarification. Therefore, the petitioner's contention of an automatic or indefeasible right to renewal is legally untenable. The law is well settled that where a contr;lct or policy confers a discretion coupled with conditions, and expressly negiltes a right of renewal, no mandamus can be issued to compel renewal contrary to such terms. Further, the parties cannot claim equities merely based rtn interim orders of "status QUO", and their case has to rest on the foundation of compliance rvith mandatory conditions. In the instant case, there is no plausible reason fbrthcoming from the petitioner as to what wp_33715_2025 NBK, J prevented him from furnishing the mandatory affidavit as per the Master Circular Guidelines, and Railway polices, stating that in case he is operating more than one Tea Stall/General Minor Unit, anywhere under the Indian Railways, he would disclose the sarne and would forgo all the other Tea Stalls/General Minor Units, except the one he is intending to seek renewal. lt is not the case of the petitioner that the respondent-Railways has been renewing, even without furnishing affidavit, and even if the persons are operating multiple Stalls, and specifically denying only to the petitioner. 6.4 From a perusal of the record, and the respective submissions, it is evident that the respondent authorities acted as per the Circular instructions and policies governing the Contract, and after affording repeated opportunities to the petitioner. The impugned order dated 26.09.2025 was passed by the competent authority, namely the Senior Divisional Commercial Manageq after the expiry of the extended period up to 3.1 .07.2025, after dismissal of W.P. No. 18604 of 2022 as infructuous on 25.08.2025, and after obtaining legal opinion. It is not the case of the petitiqner that he complied with all mandatory requirement of submission of .\, docum6ntt including the mandatory affidavit. Admittedly, the petitioner for the reasons best known to him evaded from furnishing the mandatory affidavit, and sought to project an argument that he tendered more amount for the contract hoping that it would be "5 * 3" term. Merely because the petitionerhas assumed that his contract would be for "5 +3", his contract cannot be governed on assumptions, and cannot be continued despite non- compliance with mandatory requirement of furnishing documents and affrdavit that he would forgo all other Stalls if he is operating more than one Stall. Law cannot take a detour for the benefit of petitioner. The impugned decision to terminate the petitioner's contract was based on the petitioner's t5 wp_337L6_2025 N8K, J admitted lailure to submit mandatory documents and affidavit and his continued insistence on retaining multiple stalls, which is expressly prohibited The plea of violation of principles of natural justice is unsustainable in view of the notices dated 10.03.2022 and 16.03.2022,the petitioner's own written response dated 11.03.2022, and the prolonged extensions granted during pendency of earlier litigation. The action cannot be charactr:rised as arbitrary or malafrde, as it is supported by cogent documentary evidence and a consistent policy rationale aimed at preventing monopoly and ensuring fair competition. 6.5 The petitioner has failed to demonstrate any procedural irregularity, substantive illegality, or jurisdictional infirmity in the impugned proceedings. On the contrary the material on record establishes that the petitioner sought to continue under the guise of judicial protection u,ithout complying rvith the contractual and policy framework governing renewal. Therefore, no case is therefore made out for interf-erence under Afticle 226 of the Constitution. l'he impugned termination Proceedings dated 26.09.2025 ire sustainable both in fact and in law, and the writ petition, being devoic of rnerit, is liable to be dismissed.

7. Accorrlingly, the writ petition is dismissed. No costs. Miscellaneous petitions penCing, if any, shall stand closed. /TRUE COPYII SD/.P. PONNA KRISHNA ASSISTANT REGISTRAR SECTION OFFICER To,

1. One CC to SRI POODATTU AMARENDER, Advocate. [OPUC]

2. one cc t,: SRI N.BHUJANGA RAo, Deputy solicitor Generar of rndia, High Court for':he State of Telangana at Hyderabad. [OPUC]

3. Two CD C)opies. BSK BS

HIGH COURT DATED :09/0112026

ORDER

WP.No.3i3716 of 2025 DISMISSING THE WRIT PETITION WITHOUT COSTS THF. S;-4 i t c) 2 3 JAil 2028 ;.) * RI I t I f; t I LL

You have used today's free searches. Sign in, for free, to keep searching without a limit.

Compass reads the judgments for you and finds the paragraphs for and against your question. Sign in to use it.

My Vault follows judgments for you and records every later decision that cites them. Sign in to keep one.

Sign in to download the court's PDF. The full text stays free to read here.

Sign in, for free, to download the court copy. Reading the full text here stays open to everyone.

Search and read Indian judgments without limits, save them to My Vault and find the relevant paragraphs with Compass.

Open the sign-in page instead