Supreme Court of India

T.N. GODAVARMAN THIRUMULPAD versus UNION OF INDIA & ORS. on 16 May 2024

Cites 0, Cited by 0

[2024] 6 S.C.R. 723 : 2024 INSC 426

T.N. Godavarman Thirumulpad v.

Union of India & Ors.

IA No(S). 2930 of 2010, 3963 of 2017, 160714 of 2019, 77320 of 2023 and 79064 of 2023

In

Writ Petition(Civil) No(S). 202 of 1995

16 May 2024

[B.R. Gavai and Sandeep Mehta,* JJ.]

Issue for Consideration

Interlocutory applications preferred by the applicant being aggrieved by the inaction of the respondents in deciding the application filed by the applicant seeking permission to construct a health/eco-resort on the subject land being Plot Nos. 14/3 and 14/4, falling in Sheet 2 No. 20, Civil Station, Pachmarhi, District Hoshangabad, Madhya Pradesh.

Citations and Judicial Treatment

No citing decisions in the index yet

Cited by

0

Decisions in the index citing it

Cites

0

Decisions referred to

In this index

0

Of the decisions it cites

Overruled / Questioned

0

No negative treatment found

Loading the citing and cited decisions…

Headnotes

Environment – Wildlife Sanctuary – Forest Land – Permission to construct a health/eco-resort – Applicant had preferred an application to the Central Empowered Committee and sought permission to construct the health/eco-resort on plot nos. 14/3 and 14/4 asserting that the said chunk of land was not a forest land – However, the prayer made by the applicant was not accepted whereupon, the applications under consideration came to be filed before the Supreme Court – It was contended by the State that the plots in question are subject matter of litigation in writ appeal pending before the High Court and applicant should wait the outcome of the aforesaid writ appeal:

Held: The issue raised by the State of Madhya Pradesh is with respect to the identification of the land owned by the applicant contending that the same forms a part of the Pachmarhi Wildlife Sanctuary – There have been various rounds of litigation and it is not in dispute that applicant herein was never impleaded in any of the proceedings before the Revenue Courts or the High Court – An order passed by the District Collector dated 09.08.2004, purportedly covers entire area of the Plot No. 14 and the transactions done in favour of and by one D, the sale deed executed in favour of the applicant and the mutation made in its name had never been questioned in any Court of law – Neither the Revenue Department nor the State Government authorities took the trouble of impleading the applicant as party in any of the litigations – The title acquired by the applicant over the subject plots not having been challenged, attainted finality and thus the State cannot claim a right thereupon simply because at some point of time, the plots came to be recorded as Nazul lands in the revenue records – The categoric stand in the compliance affidavit filed by the State fortifies the claim of the applicant that these plots are falling under the urban area – In this background, the appellant is justified in claiming that its proprietary rights guaranteed under Article 300A of the Constitution cannot be infringed merely on account of the pending writ appeal before the High Court – Nonetheless, the applicant would satisfy the authorities that the plots in question are beyond the Eco-Sensitive Zone – Therefore, it is directed that the application filed by the applicant for raising construction on plot Nos. 14/3 and 14/4 shall be decided objectively by the CEC/Competent Authority of the local body keeping in view the location of the land with reference to the notified boundaries of the ESZ. [Paras 8, 19, 20, 21, 23]

List of Acts

Wild Life(Protection) Act, 1972; Constitution of India.

List of Keywords

Environment; Wildlife Sanctuary; Forest Land; Permission to construct a health/eco-resort; Eco-Sensitive Zone; Proprietary rights guaranteed under Article 300A of the Constitution.

Case Arising From

CIVIL ORIGINAL JURISDICTION: IA Nos. 2930 of 2010, 3963 of 2017, 160714 of 2019, 77320 of 2023 and 79064 of 2023

In

Writ Petition (Civil) No. 202 of 1995

(Under Article 32 of The Constitution of India)

Appearances for Parties

K. Parameshwar, A.C., M.V. Mukunda, Ms. Kanti, Ms. Aarti Gupta, Chinmay Kalgaonkar, Ms. Musharraf Chawdhary, M/s. Lawyer S

Knit & Co, Chanchal Kumar Ganguli, M/s. PLR Chambers and Co., Syed Mehdi Imam, T. Harish Kumar, M/s. Mitter & Mitter Co., Advs. for the Petitioner.

Ms. Aishwarya Bhati, A.S.G., K.M. Natraj, A.S.G., Nalin Kohli, Sr. A.A.G, Saurabh Mishra, Shiv Mangal Sharma, Vaibhav Srivastava, A.A.Gs., D.S. Naidu, Ms. Vibha Datta Makhija, Ms. Archana Pathak Dave, Siddharth Bhatnagar, Ravindra Kumar, Sr Advs., Gurmeet Singh Makker, Ms. Archana Pathank Dave, Ms. Suhashini Sen, S. S. Rebello, Shyam Gopal, Raghav Sharma, Sughosh Subramanyam, Ms. Ruchi Kohli, Shuvodeep Roy, Saurabh Tripathi, Ms. Nimisha Menon, Ms. Shruti Agrawal, Sumit Kumar, Neeraj Shekhar, Animesh Kumar, Amrendra Singh, Ram Bachan Choudhary, Rajeev Nandkishore R. Kumar, Kartik Kumar, Mrs. Kshama Sharma, Mrs. Priya Pramar, Rajesh Kumar Maurya, Niranjan Swami, Raj Kishor Choudhary, Gaichangpou Gangmei, V. Balachandran, S. C. Birla, P. R. Ramasesh, Mrs. Bina Gupta, M/s. Parekh & Co., M/s. K J John and Co, H. S. Parihar, Ms. Baby Krishnan, Ms. Bina Madhavan, Shibashish Misra, Umesh Bhagwat, Mrs. M. Qamaruddin, E. C. Agrawala, Kuldip Singh, Ranjan Mukherjee, K. V. Vijayakumar, P. N. Gupta, Sarad Kumar Singhania, Ms. Jyoti Mendiratta, S. Udaya Kumar Sagar, Ms. Madhu Moolchandani, Ashok Mathur, Rajat Joseph, Gopal Prasad, Mrs. Nandini Gore, Raj Kumar Mehta, M/s. M. V. Kini & Associates, T. Mahipal, Ms. S. Janani, M/s. Arputham Aruna and Co, Surya Kant, E. C. Vidya Sagar, Amit Anand Tiwari, Ms. Adviteeya, Rakesh K. Sharma, Tejaswi Kumar Pradhan, Manoranjan Paikaray, P. K. Tripathy, Mrs. Kanchan Kaur Dhodi, Dharmendra Kumar Sinha, P. Parmeswaran, Ms. Sujata Kurdukar, Ms. Pratibha Jain, Rajeev Singh, Prashant Kumar, Ramesh Babu M. R., Vikrant Singh Bais, Shiva Pujan Singh, Ms. Sharmila Upadhyay, Kamal Mohan Gupta, Sudarsh Menon, Rajesh, M/s. Corporate Law Group, Lakshmi Raman Singh, Rajesh Singh, Mrs. B. Sunita Rao, Gunmaya S Mann, M. C. Dhingra, Ejaz Maqbool, Ms. Sumita Hazarika, Ms. Abha R. Sharma, Abhishek Chaudhary, Himanshu Shekhar, Parth Shekhar, Ms. Ambali Vedasen, Ms. Rachna Ranjan, Shubham Singh, Vijay Singh, Partap Ranjan, Ugranath Kumar, Mahabir Singh, Vivek Kumar, Vishal Prasad, Surajit Paul, Rajat Sinha Roy, Sameer Mehndiratta, Gyanesh Kumar Maheshwari, Ms. Monica Haseja, Bacha Babu Mistry, Md Sontu Mia, Ms. Moni Tomar, Mrs. Manik Karanjawala, Bhavanishankar V. Gadnis, A. Venayagam Balan, Vishwanath Gadnis, Gaurav Pal, C.

L. Sahu, Ms. Asha Gopalan Nair, Ms. Surabhi Singh, S. R. Setia, Ms. Charu Mathur, Rajiv Mehta, T. V. George, Krishnanand Pandeya, Ratan Kumar Choudhuri, Sudhir Kulshreshtha, E. M. S. Anam, Ms. K. V. Bharathi Upadhyaya, T. N. Singh, Punit Dutt Tyagi, Rathin Das, Irshad Ahmad, G. Prakash, Ms. Binu Tamta, B V Deepak, Gopal Singh, Sudhir Kumar Gupta, A. N. Arora, Ms. Malini Poduval, Ms. C. K. Sucharita, Mrs. Anjani Aiyagari, Mrs. Rekha Pandey, Mohd. Irshad Hanif, Amar Kumar Raizada, Mrs. Sushma, P. V. Yogeswaran, Jitendra Mohan Sharma, Ms. A. Sumathi, Jai Prakash Pandey, Ajit Pudussery, Ms. Hemantika Wahi, Pradeep Kumar Bakshi, Pankaj Kumar Singh, Pawan Kumar Shukla, Brij Pal, Vivek Sharma, V.S. Dubey, K. L. Janjani, Naresh K. Sharma, Tarun Johri, Radha Shyam Jena, Ram Swarup Sharma, Ms. Sushma Suri, Mrs. Rani Chhabra, Ms. Divya Roy, M. Yogesh Kanna, Nishanth Patil, M/s. Venkat Palwai Law Associates, Ms. Mayuri Raghuvanshi, Vivek Jain, Parth Awasthi, Pashupathi Nath Razdan, Ms. Maitreyee Jagat Joshi, Astik Gupta, Tarun Gupta, Ms. Vanshaja Shukla, Ms. Ankeeta Appanna, Siddhant Yadav, Chirag M. Shroff, Ms. Ruchira Goel, Siddharth Dharmadhikari, Aaditya Aniruddha Pande, Bharat Bagla, Sourav Singh, Aditya Krishna, Mayank Aggarwal, Sanjeev Kumar, Naik H.K., Manoj Kumar Sharma, Mrs. Sarbani Kar, Rajeev Kumar Dubey, Kamlendra Mishra, Somesh Chandra Jha, Siddhartha Jha, M/s. V. Maheshwari & Co., Ms. Parul Shukla, P. S. Sudheer, Ramesh Thakur, Sunny Choudhary, Karan Bishnoi, Utkarsh Mishra, Vinod Sharma, Ms. Surbhi Mehta, Rajiv Kumar Choudhry, Aastik Dhingra, Karan Mamgain, Anurag Tandon, Dr. Monika Gusain, P. K. Manohar, S. Gowthaman, A. Karthik, Siddharth Sharma, Raj Bahadur Yadav, Mrs. Ruchi Kohli, Uday Prakash Yadav, Suhasini Sen, S S Rebello, Sughosh Subramanium, Naveen Kumar, James P. Thomas, Sunil Kumar Sharma, Ms. Swati Ghildiyal, Ms. Devyani Bhatt, Krishna Ballabh Thakur, Tushar Kumar, Kaushlendra Kumar, Ms. Rashmi Kumari, Ms. Prity Kumari, Rajul Srivastava, Abhishek Prashad, Ramesh Allanki, Ms. Aruna Gupta, B. K. Pal, Ms. Shalini Kaul, Nishe Rajen Shonker, Ms. Anu K Joy, Alim Anvar, Nishit Agrawal, Romy Chacko, Robin V.s., Sachin Singh Dalal, Sravan Kumar Karanam, Ms. Tayade Pranali Gowardhan, Ms. Shireesh Tyagi, Aniket Singh, Shubhranshu Padhi, Ms. Deepanwita Priyanka, Raghvendra Kumar, Anand Kumar Dubey, Devvrat Singh, Dinesh Chandra Pandey, Dushyant Dahiya, Mrs. Jyoti Pandey, Mrs. Pragya Baghel, Sarvam Ritam Khare, Shreekant Neelappa Terdal,

Ms. Sunieta Ojha, Anirudh Sanganeria, Chinmay Deshpande, Yash Prashant Sonavane, Gopal Balwant Sathe, Aravindh S., Ms. Ekta Muyal, Mrs. Kirti Renu Mishra, Atul Sharma, Renjith B. Marar, Ms. Lakshmi N. Kaimal, Rajkumar Pavothil, Arun Poomulli, Keshavraj Nair, Avinash Krishnakumar, Kaushik Choudhury, Ms. Mrinal Gopal Elker, Dhaval Mehrotra, Binay Kumar Das, Ms. Priyanka Das, Ms. Neha Das, Shivam Saksena, Vipin Kumar Saxena, Chandra Bhushan Prasad, Abhishek Atrey, Dr. Abhishek Atrey, Ms. Vidyottma Jha, V. N. Raghupathy, Manendra Pal Gupta, M/s. D.S.K. Legal, Ms. Shibani Ghosh, Rishad A Chowdhury, Ms. Rashmi Nandakumar, Saurabh Rajpal, Ms. Nidhi Jaswal, Ms. Shalini Singh, Sandeep Kumar Jha, Milind Kumar, Mohit Paul, Mukesh Kumar Maroria, Mrs. Mrinal Elkar Mazumdar, Mukesh Kumar Verma, Neeraj Kumar Sharma, Harish Pandey, Ms. Indira Bhakar, Shashwat Parihar, Piyush Beriwal, M/s. Cyril Amarchand Mangaldas, M. R. Shamshad, Amrish Kumar, Ms. Purnima Krishna, M.F. Philip, Karamveer Singh Yadav, T. R. B. Sivakumar, Sujit Kumar Mishra , Ms. Adarsh Nain, Guntur Pramod Kumar, Ms. Anzu. K. Varkey, Ms. Astha Sharma, Ms. Lihzu Shiney Konyak, Karan Sharma, Ms. Sugandha Anand , Ms. Seita Vaidyalingam, Kumar Anurag Singh, Anando Mukherjee, Mrs. Tulika Mukherjee, Shwetank Singh, Ajay Marwah, Ravindra S. Garia, Shashank Singh, Madan Chandra Karnatkya, Mrs. Vidhya, Sudeep Kumar, Gaurav Kumar Bansal, Vishnu Gupta, Ms. Nandita Bansal, Ms. Rani Mishra, Abhimanyu Tewari, Advs. for the Respondents.

Judgment / Order of the Supreme Court

Judgment

Mehta, J.

1. These interlocutory applications have been preferred by the applicant M/s Shewalkar Developers Limited being aggrieved by the inaction of the respondents in deciding the application filed by the applicant seeking permission to construct a health/eco-resort on the subject land being Plot Nos. 14/3 and 14/4, falling in Sheet No. 20, Civil Station, Pachmarhi, District Hoshangabad, Madhya Pradesh. The total area of these two plots is around 59,265 sq. ft. and 49,675 sq. ft., respectively.

2. The applicant herein approached the Madhya Pradesh High Court by filing Writ Petition No. 14478 of 2006 seeking a direction to the respondents to favourably consider the prayer of the applicant. Vide order dated 22[nd] November, 2006, the Division Bench of Madhya Pradesh High Court permitted the applicant to approach the Central Empowered Committee(hereinafter being referred to as ‘CEC’) constituted under the directions given by this Court in Writ Petition(Civil) No. 202 of 1995. Consequently, the applicant preferred an application to the CEC seeking permission to construct the health/eco-resort on the land mentioned above asserting that the said chunk of land was not a forest land and had been acquired under valid title deeds and thus, the prayer for permission to construct may be allowed. However, the prayer made by the applicant was not accepted whereupon, the applications under consideration came to be filed before this Court.

3. The State Government had previously taken a stand in its counter that the land in issue falls within the limits of Pachmarhi Wildlife Sanctuary and therefore, by virtue of the directions issued by the CEC vide letter dated 2[nd] July, 2004, no commercial activity was permissible thereupon, without the permission of this Court.

4. Much water has flown during pendency of the original application(I.A. No.2930 of 2010) which has remained pending for almost 14 years. For sake of convenience, a chronological flow chart of dates and events is narrated hereinbelow in a tabular form: -

5. Another litigation took place regarding other transactions of land done by Dennis Torry and it will be essential to trace the history thereof.Chronological list of events in relation to the plot are being narrated hereinbelow for the sake of ready reference: - 5.1 The District Collector, Hoshangabad registered suomotorevisions against the mutation orders issued in favour of Kripa Torry and Sanjay Bhandari(purchasers of land from Dennis Torry) and vide order dated 9[th] August, 2004, these revisions were allowed holding that the transfer of land by the perpetual land holder Rodrigues in favour of Dennis Torry on 8[th] September, 1977 was illegal and without force of law and thus, mutation of land in favour of Dennis Torry was illegal. The transfer and consequent mutation in favour of Sanjay Bhandari and Shri Kripa Torry(son of Dennis Torry) was quashed and set aside by the District Collector vide order dated 9[th] August, 2004.

5.2 The aforesaid order was challenged by the purchasers by filing an appeal to the Board of Revenue, Madhya Pradesh which came to be allowed and the order dated 9[th] August, 2004

passed by the District Collector was quashed by learned Single Member, Board of Revenue vide order dated 16[th] April, 2007.

5.3 The Chairman of Revenue Board registered a suo moto revision and vide order dated 15[th] March, 2011, set aside the order passed by the learned Single Member.

5.4 The land owners Shri Sanjay Bhandari and Shri Kripa Torry preferred a Writ Petition No. 8098 of 2011 for questioning the legality of order dated 15[th] March, 2011 and the said writ petition was allowed by the learned Single Judge of the Madhya Pradesh High Court vide order dated 3[rd] January, 2014 thereby, reversing the order dated 15[th] March, 2011 passed by the Board of Revenue.

6. This Court is apprised that the State has preferred an appeal(Writ Appeal No. 2100 of 2019) against the order passed by the learned Single Judge which is still pending adjudication and no order of stay is passed in the said writ appeal.

7. The CEC has submitted a report dated 16[th] June, 2020 in these proceedings objecting to the permission sought by the applicant. The applicant has also filed objection to the report of the CEC.

8. The issue which has now been raised by the State of Madhya Pradesh is with respect to the identification of the land owned by the applicant contending that the same forms a part of the Pachmarhi Wildlife Sanctuary. Considering the above contention, this Court raised the following query on 22[nd] November, 2023: - “2. We, therefore, direct the Collector, Hosangabad to file an affidavit annexing therewith a map of the aforesaid area of 395.939 hectares and also specify as to whether the land belonging to the applicant(s) is within those 395.939 hectares or beyond that area.”

9. In compliance of the said direction, an affidavit has been filed on behalf of the State of Madhya Pradesh(also referred to as, ‘compliance affidavit’). The relevant portions thereof are extracted hereinbelow: - “2. That, this Hon’ble Court has raised following queries to the respondent/State of M.P.:-

(i) To annex the map demarcating an area of 395.939 hectares of the Nazul Land falling in the Panchmarhi

Plateau, which was to be excluded from the Panchmarhi Wildlife Sanctuary as per order dated 12.08.2013 passed by this Hon’ble Court in I.A. No.2202-2203.

In respect of aforesaid, it is pertinent to mention here that the said map demarcating an area of 395.939 hectares of Nazul Land falling in the Panchmarhi Plateau, the Plot No.14/3 area 59255 sq. ft. and 14/4 area 49365 sq. ft. are excluded from Panchmarhi Wildlife Sanctuary and the same are within the area of 395.939 hectares and recorded as Nazul Land in the name of State of M.P.

A true copy of colored map of is being marked and filed herewith as Annexure A-1.

(ii) The Collector Hosangabad was directed to file an affidavit annexing therewith a map of the aforesaid area of 395.939 hectares and also specify as to whether the land belonging to the applicant is within those 395.939 hectares or beyond that area.

In respect of aforesaid, it is pertinent to mention here that the Collector, Hoshangabad vide affidavit dated 06.01.2024 stated that the land mentioned, NazulBhumi Sheet No.20, Plot No.14/3 and 14/4, area 59255 sq. ft. and 49365 sq. ft. total area 108900 sq. ft. is situated in Panchmarhi and recorded as maintenance Khasra in the Government of M.P. The plot No.14/3, 14/4 is within the area of 395.939 hectares which was excluded from the Panchmarhi Wildlife Sanctuary.

2. That, it is respectfully submitted that in respect of Plot No.14/3 and 14/4 a report was sought from Sub-Divisional Officer, Revenue, Pipariya whereby it was reported that Plot No.14/3 and 14/4 are recorded in name of State of M.P. in Sheet No.20 of Nazul Maintenance Khasra No.2023-24, said land of Plot No.14/3 and 14/4 is vacant on the spot, there is no kind of construction over there, said plots are situated under urban area of Panchmarhi. Moreover, the permission for construction/re-construction in the Cantonment Board, Panchmarhi lies under the jurisdiction of Chief Executive Officer, [2024] 6 S.C.R. 

Cantonment Board, Panchmarhi and the permission for construction/re-construction in the Special Area Development Authority(SADA), Panchmarhi lies with the jurisdiction of Chief Executive Officer, Special Area Development Authority(SADA), Pachmarhi, In respect of above, no permission for construction/re- construction was issued by the Tehsildar, Pipariya.

8. That, on 03.01.2014, the Hon’ble High Court of M.P. at Jabalpur passed an order in W.P. No.8098/2018 in petition filed by Kripa Tori and others challenging the order dated 15.03.2011 of the Board of Revenue. The Hon’ble High Court set aside the order dated 15.03.2011 and thereby restored the previous order dated 22.07.1995 whereby the order of the Nazul Adhikari had been affirmed.

A true copy of the order dated 03.01.2014 passed by the Hon’ble High Court of M.P. at Jabalpur in Writ Petition No.8098/2011 is being marked and filed herewith as Annexure A-9.

It is pertinent to mention here that the aforesaid order dated 03.01.2014 of the Hon’ble High Court is in respect of Plot No.14/1 and 14/2 whereas the applicant herein is claiming relief in respect of Plot No.14/3 and 14/4 which were purchased by Ashutosh S/o Shriram Shewalkar and M/s Shewalkar Developers Pvt. Ltd. on 13.09.1991. The said Plot No.14/3 and 14/4 at present are recorded in the name of State of M.P. as Nazul Land. The State of Madhya being aggrieved with the order dated 03.01.2014 has filed an appeal before the Division Bench of the Hon’ble High Court which is pending adjudication as Writ Appeal No.2100/2019.

9. That, it is submitted here that the said proceedings before the Hon’ble High Court pertains to Kripa Tori &Ors. and the present intervenor M/s Shewalkar Developers was not a party before any of the Revenue Courts or the High Courts.

10. That, as per notification dated 19.08.2017, the area under the entire Pachmarhi region admeasuring

1532.521 hectares has been declared as “Eco-sensitive Zone” and the Plot No.14/3 and 14/4 fall within the notified boundaries of said notification.

11. That, in view of notification dated 09.08.2017 “no new resort can be constructed and only repairs etc. can be done”. Moreover, the Hon’ble High Courtvide interim order dated 01.11.2002 in W.P. No.5937/2002 stayed the construction by making following observation:- “Subject to hearing other side, further construction in and around Pachmarhi Hill Resort is stayed till further order”.

The aforesaid clarification about stay order being applicable only to new construction has been reiterated by the Hon’ble High Court in its order dated 22.01.2004 in following words:-

“By further order dated 13.07.2004, the interim order was clarified that the order of stay will not come in the way of repairing of roads by the State or carrying out repairs to existing building by respective provided, however, that repairs work of any building can be undertaken only after taking due permission from the concerned authority.””

(emphasis supplied)

10. Shri D.S. Naidu, learned senior counsel representing the applicant drew the Court’s attention to the order dated 15[th] December, 2000 passed by the Department Officer(SDO), Pipariya on the application preferred by the applicant seeking mutation based on a registered sale deed dated 13[th] September, 1991 executed by the land owner Dennis Torry in favour of the applicant. The SDO accepted the said application taking note of the fact that Plot No.14 admeasuring 3,23,365 sq. ft. was entered in the name of Dennis Torrywho sought and was granted permission to sell the plot in question, by the Government of Madhya Pradesh vide order dated 1[st] May, 1991. Thereafter, by a registered sale deed dated 13[th] September, 1991, Dennis Torry had sold the subject plots of land toAshutosh Shewalkaron behalf of the applicant company. Consequently, the SDO directed that the land sold by Dennis Torry should be mutated in the name of M/s Shewalkar Developers Ltd. through Ashutosh Shewalkar, resident of Nagpur. There is no dispute that the aforesaid order passed by the jurisdictional Revenue Officer in favour of the applicant has not been questioned in any Court of law.

11. Shri Naidu also drew the Court’s attention to the report of the CEC dated 16[th] June, 2020, as per which the permission to construct has been denied to the applicant on the ground that the State of Madhya Pradesh had filed an affidavit stating that the land falls in the Pachmarhi Wildlife Sanctuary and that the same had been purchased in violation of the provisions of the Wild Life(Protection) Act, 1972.

12. Shri Naidu contended that this objection raised by the State with reference to the Eco Sensitive Zone(hereinafter being referred to as ‘ESZ’) notification dated 9[th] August, 2017 is totally against the material available on record. He drew the Court’s attention to the site map dated 26[th] December, 2023(Annexure A-1 annexedwith the compliance affidavit dated 12[th] February, 2024 filed by the respondent-State of Madhya Pradesh) to contend that as a matter of fact, the land owned by the applicant is located right on the periphery of the Nazul land, at a distance of about 10 kms. from the forest area and therefore, the same is well beyond the ESZ area.

13. Shri Naidu further submitted that in view of the categoric assertion made in the compliance affidavit dated 12[th] February, 2024, filed on behalf of the State, it is clear that the plots in question are located in the urban area of Pachmarhi and thus, there is no question of these plots being covered either under the wildlife sanctuary or the ESZ area. He thus urged that the applicant deserves the relief sought for.

14. Per contra, learned counsel appearing for the respondents have opposed the submissions advanced by Mr. Naidu. Learned counsel for the State of Madhya Pradesh urged that the plots in question are subject matter of litigation in the writ appeal pending before the Division Bench of the Madhya Pradesh High Court and thus, the applicant should await the outcome of the aforesaid writ appeal before seeking permission to construct the health/eco-resort on the land in question.

15. His further contention was that the plots in question are recorded in the name of the State of Madhya Pradesh and hence, the applicant cannot claim any right thereupon.

16. Mr. K. Parameshwar, learned Amicus Curiae appearing on behalf of the CEC submitted that in view of the ESZ notification dated 9[th]

August, 2017, permission to raise a new construction on the land in question cannot be granted and whatever permissions are sought for, have to be routed through the CEC.

17. Learned counsel appearing for the Union of India adopted the submissions advanced by the standing counsel for the State and learned Amicus Curiae.

18. We have given our thoughtful consideration to the submissions advanced at bar and have gone through the material placed on record.

19. It is not in dispute that the applicant herein was never impleaded in any of the proceedings before the Revenue Courts or the High Court as has been emphatically stated in Para-9 of the compliance affidavit dated 12[th] February, 2024. It is thus, clear that irrespective of the fact that the order passed by the District Collector dated 9[th]August, 2004, purportedly covers entire area of the Plot No. 14 and the transactions done in favour of and by Dennis Torry, the sale deed executed in favour of the applicant and the mutation made in its name had never been questioned in any Court of law. Neither the Revenue Department nor the State Government authorities took the trouble of impleading the applicant as party in any of the abovementioned litigations. The title acquired by the applicant over the subject plots not having been challenged, attainted finality and thus the State cannot claim a right thereupon simply because at some point of time, the plots came to be recorded as Nazul lands in the revenue records. The categoric stand in the compliance affidavit filed by the State(reproduced supra) fortifies the claim of the applicant that these plots are falling under the urban area.

20. In this background, the applicant is justified in claiming that its proprietary rights guaranteed under Article 300A of the Constitution of India cannot be infringed merely on account of the pending writ appeal before the Madhya Pradesh High Court.

21. Resultantly, we are of the firm opinion that the permission sought by the applicant for raising construction of health/eco-resort cannot be opposed only on account of pendency of the writ appeal before the Madhya Pradesh High Court. However, it can be said without a cavil of doubt that activities, if any, on the Plot Nos. 14/3 and 14/4 purchased by the applicant from Dennis Torry would have to be carried out strictly in accordance with the ESZ notification dated 9[th]

August, 2017, issued by the Ministry of Environment, Forest and Climate Change. Nonetheless, the applicant would be at liberty to satisfy the authorities that the plots in question are beyond the Eco-Sensitive Zone.

22. Furthermore, since the writ appeal pending before the Madhya Pradesh High Court arises out of the orders passed in relation to the title rights of Dennis Torry, from whom the applicant purchased the plots in question, the activities, if any, undertaken by the applicant on the said plot of land would also remain subject to the outcome of the said writ appeal.

23. We, therefore, direct that the application filed by the applicant for raising construction on plot Nos. 14/3 and 14/4 shall be decided objectively by the CEC/Competent Authority of the local body keeping in view the location of the land with reference to the notified boundaries of the ESZ.

24. While deciding the application filed by the applicant, the authorities shall also bear in mind the fact that it is the pertinent case presented before this Court that a large number of resorts of Madhya Pradesh Tourism Development Corporation and Special Area Development Authority(SADA) are existing on areas abutting the land owned by the applicant.

25. The application/s shall be decided within a period of two months from today. Needless to say, that in the event of any adverse orders being passed, the applicant shall be at liberty to challenge the same as per law.

26. The applications are disposed of in above terms. No order as to costs.

Headnotes prepared by: Ankit Gyan

Result of the case: Applications disposed of.

You have used today's free searches. Sign in, for free, to keep searching without a limit.

Compass reads the judgments for you and finds the paragraphs for and against your question. Sign in to use it.

My Vault follows judgments for you and records every later decision that cites them. Sign in to keep one.

Sign in to download the court's PDF. The full text stays free to read here.

Sign in, for free, to download the court copy. Reading the full text here stays open to everyone.

Search and read Indian judgments without limits, save them to My Vault and find the relevant paragraphs with Compass.

Open the sign-in page instead